Malmö University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Tidig entreprenörsinvolvering: Samverkan i projekteringsprocessen
Malmö University, Faculty of Culture and Society (KS).
Malmö University, Faculty of Culture and Society (KS).
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Denna uppsats undersöker Early Contractor Involvement (ECI) som är en ny samverkansmetod vilken är avsedd att hantera komplexiteten i samhället och handskas med problematiken inom den svenska byggindustrin. ECI syftar främst till involvering och användning av entreprenörens expertkunskaper i projekteringen för projektet. Detta för att öka möjligheterna att i förväg kunna säkerställa att ett byggprojekt kan byggas på ett effektivt sätt, både vad gäller tid och pengar. Vi har genomfört en fallstudie av ECI-projektet deletapp Centralen, som är en del av det omfattande infrastrukturprojektet Västlänken i Göteborg. Syftet med vår studie har varit att undersöka hur konceptet ECI handskas med problematiken inom samhället och byggindustrin. Genom djupgående analys av intervjuer med involverade aktörer i projektet har vi identifierat faktorer som påverkar implementeringen och upprätthållandet av ECI som samverkansmetod. I vår undersökning har ECI presenterat diverse praktiska möjligheter för vårt studieobjekt, såsom innovativa tekniska lösningar och effektivisering inför byggnation. Dock har en hel del utmaningar med ECI framträtt. Resultaten som har framkommit är att den inledande tiden då beställare, entreprenör och konsulter påbörjade arbetet var bristfällig. Både teori och resultat från intervjupersoner pekar på att problematiken kring förtroende, arbetsfördelning och personkemi går att härledas till den allra första inledande tiden för projektet. Dock var involverade aktörer väl medvetna om att problem eller kritiska situationer skulle uppstå men där fanns sällan bra sätt att hantera dessa. Resultat i vår studie visar även på problematik att införa dynamiska processer, såsom ECI, i organisationer som efterfrågar strukturell ordning.

Abstract [en]

This paper examines Early Contractor Involvement (ECI), which is a new method of collaboration that is designed to handle complexity in society and deal with the problems in the Swedish construction industry. ECI aims primarily at the involvement and use of the entrepreneur's expert knowledge in the early design and planning phase of the project. This in order to increase the opportunities to ensure that a construction project can be built efficiently, both in terms of time and money. We have conducted a case study of the ECI project deletapp Centralen, which is part of the extensive infrastructure project West Link in Gothenburg. The purpose of our study was to investigate how the ECI concept deals with the problems in society and the construction industry. Through in-depth analysis of interviews with involved actors in the project, we have identified factors that affect the implementation and maintenance of ECI as a collaborative method. In our study, ECI has presented various practical possibilities for our study object, such as innovative technical solutions and efficiency for construction. However, a lot of challenges with ECI have emerged. The results that have emerged are that the initial time when the client, contractor and consultants started work was inadequate. Both theory and results from interviewees point out that the problem of trust, division of work and personal chemistry can be deduced to the very first initial time of the project. However, actors involved were well aware that problems or critical situations would arise, but there were seldom good ways to deal with them. Results in our study also show problems in introducing dynamic processes, like ECI, in an organization that seeks structural arrangements.

Place, publisher, year, edition, pages
Malmö universitet/Kultur och samhälle , 2018. , p. 64
Keywords [sv]
Early contractor involvement, upphandling, byggentreprenad, projektering, management, process, samverkan, Västlänken
National Category
Social Sciences
Identifiers
URN: urn:nbn:se:mau:diva-23672Local ID: 25727OAI: oai:DiVA.org:mau-23672DiVA, id: diva2:1483640
Educational program
KS US Stadsbyggnad, stadsutveckling och planering
Supervisors
Examiners
Available from: 2020-10-27 Created: 2020-10-27Bibliographically approved

Open Access in DiVA

fulltext(803 kB)242 downloads
File information
File name FULLTEXT01.pdfFile size 803 kBChecksum SHA-512
de8d5237a59ef27ceef5e0586d721c940d5a8804137c46f2954352da007933169c7870556c3dbad6b1581872b3a15e8f1d35b2e5667699051c6806c2d790a24b
Type fulltextMimetype application/pdf

By organisation
Faculty of Culture and Society (KS)
Social Sciences

Search outside of DiVA

GoogleGoogle Scholar
Total: 243 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 232 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf