Malmö University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Leveranslogistik på byggarbetsplatsen
Malmö högskola, Faculty of Technology and Society (TS).
Malmö högskola, Faculty of Technology and Society (TS).
2007 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Problem: How do delivery logistics work in practice at the building site? Where are the big problems? How to make building logistics more effective? Do the site management and the haulers agree about questions concerning both parties? What is possible to gain by using better logistics? Is it possible to gain time with better logistics and by that reducing the costs? Purpose and aim: The purpose is to discover if there are any disagreements between the site management and the haulers. If disagreements occur they will be examined and probable measures based on the problems will be suggested. Another intention is to bring key ratios concerning time spent for deliveries forward. One aim is to update a similar report made in 1972. Another one is to clarify the big disagreements in order to make both parties aware of them. Method: We have with questionnaires tried to find out if the site management and the haulers have any disagreements. To see how the delivery logistic work we visited five different building sites and spent two days at each. Conclusion: - Deliveries stay in average longer at the building site than the site management and the haulers believe. - The haulers can save a lot of time if they early notify when they are going to arrive to the building site and then they did not have to wait while they are there. - If the site management had an organised plan concerning different things should be they could avoid unnecessary costs in damages. - If the building sites use a booking system for the machines they could avoid double booking.

Place, publisher, year, edition, pages
Malmö högskola/Teknik och samhälle , 2007.
Keywords [sv]
logistics
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mau:diva-23966Local ID: 4619OAI: oai:DiVA.org:mau-23966DiVA, id: diva2:1483934
Educational program
KS US Byggdesign
Available from: 2020-10-27 Created: 2020-10-27 Last updated: 2022-06-27Bibliographically approved

Open Access in DiVA

fulltext(1393 kB)190 downloads
File information
File name FULLTEXT01.pdfFile size 1393 kBChecksum SHA-512
d5ae6959b77c20ecee29e2ba3cfe8d46738921bc6d6c25753a59eed55e18143be2261db12a0a10d75d1d89e5370edc96972cb687def7686c110af38033bd3177
Type fulltextMimetype application/pdf

By organisation
Faculty of Technology and Society (TS)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 190 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 28 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf