Malmö University Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Involvera yrkesmedarbetarna i planeringen och effektivisera byggprojekt
Malmö University, Faculty of Technology and Society (TS).
Malmö University, Faculty of Technology and Society (TS).
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

För att uppnå ekonomisk vinning och framgång krävs det att byggföretag lägger stor vikt på hur de kan effektivisera byggprocessen och minska sina kostnader. Enligt branschen finns det förbättringspotential gällande kommunikationen i byggprojekt varav störst förbättrings-möjlighet anses ligga hos entreprenören. Arbetsplatsomkostnader står för 19 % av ett projekts kostnader och är en av kostnadsposterna som entreprenören har en möjlighet att påverka. En förbättring i kommunikationen mellan yrkesmedarbetare och arbetsledare kan minska arbetsplatsomkostnaderna, leda till ökad lönsamhet och en effektivare produktion. Studiens syfte var att kartlägga produktionens planering, uppföljning och hur yrkesmedarbetarnas deltagande i produktionsplanering kan effektivisera produktionen. Studien utreder hur kommunikationen fungerar mellan yrkesmedarbetare och arbetsledare, hur yrkesmedarbetare involveras i planeringen idag och hur involveringen kan förbättras. Studien tar även upp om Last Planner System vore en möjlig lösning till produktivare byggprojekt. En litteraturstudie kring kommunikation, motivation och Last Planner System samt en fallstudie där observationer och intervjuer på två byggprojekt har utförts för att kunna besvara studiens syfte och frågeställningar. Last Planner System är en metod som används för att effektivisera projekt där den som är närmst utförandet, sisteplaneraren, involveras i planeringen. Med grundläggande teori om Last Planner System, kommunikation, ekonomi och planering kunde relevanta intervjufrågor tas fram. Intervjuer och observationer visar att både arbetsledare och yrkesmedarbetare ser positivt på ett tidigare involverande av yrkesmedarbetare i planeringen än i dagsläget. Resultatet visar förbättringsmöjligheter i såväl kommunikation som planering. Last Planner System ses som en möjlig lösning. Dagens mötesstruktur i produktionen involverar inte yrkesmedarbetare. Genom att arbetsledningen bjuder in yrkesmedarbetare till möten gällande tekniska lösningar och tidsåtgång för kommande moment kan arbetsbelastningen för arbetsledare minska och motivationen hos yrkesmedarbetare öka. En mötesstruktur utifrån Last Planner System har tagits fram som stöd till projekt som väljer att arbeta med Last Planner System. Involverandet av sisteplaneraren genom Last Planner System skulle leda till en effektivare produktion och minskade arbetsplatsomkostnader.

Abstract [en]

In order to achieve profitability and success it’s required that construction companies work on how to reduce the costs. Overhead costs stand for a large cost. By improving the communication between coworkers overhead costs can be reduced. The aim was to study how coworkers participation in the production planning can improve the productivity. The study shows how communication and involvement between coworkers is today and how it can be improved. A literature study in communication, economics, motivation and Last Planner System as well as a case study with observations and interviews has been done to answer the questions of the study. The Last Planner System is a method to improve planning by involving The Last Planner. Interviews and observations show that coworkers are positive to The Last Planner System. The result shows that Last Planner System is a possible solution to improve communication and planning. The meeting structure today doesn’t involve The Last Planner. The site manager should invite The Last Planner into meetings regarding production planning. A meeting structure based on Last Planner System has been developed as support for projects who choose to use The Last Planner System. The involvement of The Last Planner would lead to more efficient production and reduced overhead costs.

Place, publisher, year, edition, pages
Malmö universitet/Teknik och samhälle , 2019. , p. 55
Keywords [sv]
Last Planner System, Communication, Construction
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mau:diva-20264Local ID: 29470OAI: oai:DiVA.org:mau-20264DiVA, id: diva2:1480137
External cooperation
Skanska
Educational program
TS Byggingenjör
Supervisors
Examiners
Available from: 2020-10-27 Created: 2020-10-27Bibliographically approved

Open Access in DiVA

fulltext(22346 kB)254 downloads
File information
File name FULLTEXT01.pdfFile size 22346 kBChecksum SHA-512
009d29450100ae4286550fc2d12330da4fc362d7076d31ecf73e5f1bf8c3163054a783ca7b181363b1fd675d091fc38c2ca0399e7feee12ccad314be30e9785b
Type fulltextMimetype application/pdf

By organisation
Faculty of Technology and Society (TS)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 254 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 101 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf